JRC received this project in Jackson, AL for a full roof replacement. The facility’s roof was hit by bad weather causing damage to the integrity of the roof and creating major leaks. We removed all existing roof materials down to the metal deck and installed new deck panels. Mechanically attached coverboard and two layers of poly-iso over the metal deck. Next, we mechanically attached, via Rhinobond, the new Johns Manville TPO over the coverboard and poly-iso assembly.